Property · 61 of the best in Belgrade

Marina Dorćol

New development·Dorćol·Phase I to 2028

Sebre

About Marina Dorćol

A new riverside neighbourhood on the Danube embankment in Dorćol, a short walk from Kalemegdan, built around a marina and the restored 1930s power station Snaga i svetlost.

The back story

Lower Dorćol, between the old town and the Danube, was for centuries Belgrade’s working riverside, with mills, warehouses and the port. In 1932 a modern power station opened here under a foreign concession: Snaga i svetlost (Power and Light), which supplied Belgrade until 1969. Its brick halls and chimney are a rare piece of the city’s industrial heritage and were declared a cultural monument in 2013.

After the plant closed, the riverbank sat half-forgotten, with a small marina, boatyards and empty land, even as Dorćol above it became one of the most fashionable neighbourhoods in Belgrade.

The Snaga i svetlost power station is being restored as a cultural and arts centre with its own park.

The new quarter

Designed by the Kuzmanović + Fiala studio of Jelena Kuzmanović and Stanislav Fiala, Marina Dorćol brings apartments and ground-floor shops around a new marina basin, with more than 30,000 square metres of new green space linked to the Danube Linear Park, which runs along the river from the fortress. The Snaga i svetlost power station is being restored as a cultural and arts centre with its own park.

Construction of the first phase began in 2025, with completion and handover planned for the third quarter of 2028.

For visitors

Walk along the Danube Linear Park from the Belgrade Fortress to see the new quarter take shape, then head up into Dorćol’s streets for cafés and cocktail bars on Strahinjića Bana.

Why it's on our list

  • On the Danube, near Kalemegdan
  • 30,000+ m² of new green space
  • Old power station becomes an arts centre

The project

From Marina Dorćol’s official project page.

What’s planned · 5

Apartments, most with two or three per floor, Shops on the ground floors, More than 30,000 m² of green space, A link to the Danube Linear Park, The Snaga i svetlost power station restored as a cultural and arts centre

Timeline (Phase I)

  1. Building permit Q1 2025
  2. Construction started Q3 2025
  3. Completion and handover planned Q3 2028

Design · 1

Architects Stanislav Fiala and Jelena Kuzmanović (Kuzmanović + Fiala)

Listings, fees and opening hours change, so please contact Marina Dorćol directly before you visit.

Join the conversation

What do you think of Marina Dorćol? Share your views, hopes and questions with other visitors and Belgraders.

  1. Loading the conversation…

House rules: keep it about Belgrade and the topic; off-topic political slogans and campaigning on any cause will be removed. Be civil and respectful, no personal attacks, no links or advertising. Comments are public and moderated, and we may remove any that break the rules. Please don’t share personal details such as phone numbers or emails.

Location

The ULTIMATE letter

Belgrade in your inbox

An occasional email with new places, concerts and exhibitions, mountain tips and our latest in-depth articles. No spam, ever.